Real Jobs · Real Results

Our Work — Real Job Photos

Every photo below is from an actual NextLevel Repipe job. PEX-A, copper, patching, and everything in between — this is what we deliver.

Watch Our Work

See a Repipe In Action

Press play to watch real footage from our repipe projects.

0:00 / 0:23
Drywall spackle patches applied in corner before final texture and paint
Vertical wall access cuts with plastic dust barrier in place during repipe
Plastic dust corridor leading to a doorway with wall access holes on the left
Garage staging area sealed in plastic with ladder, tools, and cabinets protected
Wall repair band patched and primed above the countertop and outlet
Kitchen wall patched and ready — outlets, switch plates, and faucet access restored
Drywall patch between two kitchen outlets ready for texture and paint
Wall patching complete — new chrome fixture stub-outs and electrical receptacle installed
Furniture shrouded in plastic with ladder and bin staged in the work zone
Copper pipe and toolbox staged on taped-down plastic at an exterior balcony
Arched hallway sealed in plastic with recessed light glowing above
Technician on a ladder working ceiling access seen through a doorway
NextLevel crew at work inside a fully contained room with drop cloths down
Chandelier and ceiling cutouts above a plastic-sealed work area with three ladders
Vanity wall opened for repipe access with copper lines exposed above the fixture
Werner ladder in a sealed room with shuttered window fully draped in plastic
Chandelier and ceiling openings above a plastic-sealed work area with ladders
Bathroom vanity opened for access with new PEX lines dropping from the ceiling
Recessed lighting and built-in shelving protected under plastic sheeting
Plastic dust corridor with taped floor protection leading to the work area
Interior work zone draped in plastic with cutouts at the ceiling
Orange fiberglass ladder in a plastic-sealed room with ceiling openings
Werner ladder staged at a doorway with ceiling access cutouts above
Stair railing wrapped in plastic with sconce lit above the landing
Plastic dust corridor leading into a fully contained living area
Balcony workstation with Milwaukee tool boxes and protective floor covering
Exterior stairs and entry protected with plastic during interior repipe
Bathroom vanity and glass shower enclosure protected under plastic
Row of ceiling access cutouts exposing framing and ductwork above a stairwell
Garage floor and doorway sealed in plastic with tools staged inside
Living room and kitchen sealed with plastic and ladders staged for ceiling work
Tub, toilet, and vanity all wrapped in plastic inside the bathroom work zone
Bathroom vanity opened for repipe access with fixtures staged nearby
Bathroom double vanity and cabinetry protected with plastic sheeting
Copper pipe stock laid out on the driveway beside an open garage
Driveway staging with copper fittings organized in RIDGID tool boxes
Ceiling opening above sliding doors with ladders and copper staged inside
Wall access holes with insulation exposed behind protective plastic
Ceiling cutouts and vent pipe exposed in a plastic-sealed room
Room fully wrapped in plastic with a row of ceiling access cuts
Garage work zone with protective plastic, insulation pile, and copper pipe staged
Exterior pressure regulator and hose bib assembly with red shutoff valve
Wall access openings revealing studs, insulation, and copper runs
Exterior stucco opened below the window to access copper supply lines
Knockdown wall texture restored after patching, ready for paint
Staircase railing and open room wall during repipe work
New Uponor PEX-A washer box with hot and cold shutoff valves installed
Textured wall and crown molding with hallway sealed in plastic
Ceiling corner opened with insulation exposed and plastic draped below
Staircase and balcony wrapped in plastic in a high-ceiling entry
Row of ceiling access cuts above a sealed hallway work zone
Chandelier and arched window protected in a two-story foyer
Two-story entry and staircase sealed with plastic during repipe
Exterior shutoff and pressure regulator assembly with new copper run
Old cast iron drain sections removed from the line, laid out on the lawn
Stucco opened to expose ABS drain repair with hose bib below
New copper pipe stock and tool chest staged at open garage
Copper hose bib tee tied into irrigation manifold at exterior wall
Caution-taped mainline trench with new blue line running along the house
Exterior mainline trench with new blue PEX and pressure gauge at wall
Protected living room with framed photo wall and plastic-covered seating
Low-angle view of opened ceiling and plastic-covered contents
Living space with ceiling cutouts and plastic draped over furniture
Patio staging area with coiled PEX and toolboxes between installs
Ladder beside an open cabinet inside the sealed kitchen work zone
Furniture fully tented in plastic with wall openings cut for piping
Technician on a ladder working a wall opening above the vaulted beams
Kitchen and living area wrapped in plastic with Moen boxes staged
Ceiling access cuts above a niche and window, protected with plastic
Garage work zone sealed off with heavy plastic dust containment
Dust barrier across hallway with tools staged and wall opened for access
New pressure regulator and copper riser at exterior stucco wall
Ceiling opened in a row of cuts revealing PEX runs above
Hallway contained in plastic with ladder staged at the entry door
Front entry sealed with plastic sheeting during interior repipe work
New PVC risers and open trench beside brick walkway during mainline work
Driveway and entry protected with plastic while crew sets up for the day
Trench running from meter to house with spoil piles covered in plastic
Mainline trench cut across front lawn with new blue pipe laid in the ground
Whole-home filtration tank with PVC and copper tie-in at garage ceiling
Vanity cabinet opened to show new supply valves, braided lines, and P-trap
NextLevel crew member trenching for a mainline replacement
Excavated riser at exterior wall where main line ties into new piping
Galvanized main line with brass ball valve at exterior brick wall
Kitchen sink and counter wrapped in plastic with green tile backsplash
Small bath or utility room taped off with drop cloth and tools staged
Wall opened to expose new PEX runs with ladder staged on protected floor
Exterior copper hose bib with brass backflow preventer against stucco wall
Kitchen range and cream cabinetry viewed through protective plastic film
Room floor and furniture tented in plastic with ladder visible in adjoining space
Hallway sealed with taped plastic sheeting leading into contained work room
Kitchen range and cabinets protected behind plastic barrier during repipe
Red ladder in room sealed with plastic sheeting — view through doorway
Hallway with built-in cabinetry wrapped in plastic and Moen box staged
Ceiling cutouts exposing joists with ladder staged in contained work zone
Three wall openings revealing horizontal copper runs beside a recessed light
New copper stub-outs with chrome escutcheons and shutoff valves at vanity wall
Copper manifold and filtration connections at wall-mounted water system
Kitchen ceiling opened for repipe with cabinetry and island left in place
Wall openings above French doors revealing copper runs inside stud cavities
Living area with ceiling access cuts exposing framing and pipe routing
New tankless water heater and stainless water treatment system with copper piping
Two ladders in place with plastic sheeting covering walls and floors
Living room furniture, art, and walls covered with protective plastic
Werner ladder staged inside doorway with flooring protected by plastic
Kitchen cabinets, counters, and refrigerator fully wrapped in plastic
Room floor covered with plastic sheeting and ladder staged for repipe access
Bathroom vanity and toilet area sealed with plastic during repipe work
Ceiling access opening cut beside soffit and recessed lighting for overhead pipe work
New chrome shower valve and tub spout installed with tile wall finished
Insulated copper lines routed through opened wall cavity with cross-brace support
Multiple wall access openings revealing copper runs with new recessed lights
New pressure regulator, ball valve, and hose bib installed on exterior copper line
Freshly filled floor trench after slab access for plumbing replacement
Concrete floor patch poured where new drain and supply lines were run
Sanded drywall patch ready for texture after repipe access closure
Drywall patches finished on ceiling and walls, work area sealed with plastic
Wall opening showing new copper and PEX supply rough-in with chrome fixtures
Exterior copper mainline with new PRV, ball valve, and hose bib at stucco wall
Doorway sealed with plastic containment while work moves through the room
Protected corner enclosed in plastic sheeting during repipe
Wall access openings exposing new PEX and copper runs beside light switch
New copper and brass hose bib installed at exterior wall
Living space sealed floor to ceiling with plastic and drop cloths
Drywall opening cut in ceiling with ladder staged behind protective plastic
Room fully draped in plastic sheeting with ceiling access in progress
Garage protected with plastic — attic ladder staged above wrapped tool chest
Interior corner sealed with clear plastic sheeting before repipe work begins
Terracotta ceiling with access holes revealing copper pipes and black drain line
Exterior stucco wall opened in three sections to expose and replace copper piping
Ceiling cutout with new copper pipes, metal support bracket, and insulation visible
Ceiling access trench exposing copper supply lines and black drain pipe through joists
Exterior stucco patch blended and retextured after repipe access opening
Garage utility room protected — ladder staged, appliances and cabinets wrapped
Room corner sealed with plastic containment during whole-home repipe
Hallway draped floor-to-ceiling in plastic — ceiling access holes for overhead pipe runs
Vertical wall access cuts with plastic dust barrier in place during repipe
Hallway fully contained with plastic sheeting — ceiling access holes cut for pipe routing
Knockdown wall texture matched seamlessly after repipe patching
Kitchen wall patched and ready — outlets, switch plates, and faucet access restored
Drywall spackle patches applied in corner before final texture and paint
Wall patching complete — new chrome fixture stub-outs and electrical receptacle installed
Garage laundry area with wall access and new copper mainline connections
Technician running new PEX supply lines through ceiling access opening
Ceiling strip access with new PEX pipe runs and insulation visible
Hallway ceiling access holes showing clean pipe routing
Open foyer with ceiling access holes and crew working inside
Modern bathroom remodeled after repipe — new shower and fixtures installed
Bedroom wall access and plastic protection during repipe
Large wall section opened showing PEX and copper pipe routing during repipe
Bathroom vanity with floor protection — ready for repipe access work
Bedroom furniture and walls protected with plastic sheeting
Bathroom protected during repipe — toilet and vanity wrapped in plastic
Water heater area with new copper connections and ceiling access holes
Garage ceiling access with water heater area and new pipe routing
Garage staging area with crew at work and tools organized
Hallway covered with plastic protection during repipe work
Island kitchen wall access holes showing new PEX supply lines installed
Living room fully covered with walls and furniture protected during repipe
Living room ceiling with PEX runs and full plastic drop cloth protection
New PEX lines threaded through ceiling opening with wall protection in place
Full kitchen wrapped in plastic sheeting during whole-home repipe
Kitchen ceiling opened with plastic protection over cabinets and appliances
Long ceiling trench showing PEX run through open joists
Ceiling access strip cut for overhead PEX routing — patched and painted clean
Bathroom wall with multiple access holes for supply line replacement
Clean pipe routing through wall cavity
Home interior with ladder and wall opening for pipe installation
Bathroom mirror and vanity wall with new plumbing access opening
Full-length mainline trench with blue PEX replacement line and caution barrier stakes
Wall access holes with plastic sheeting barriers protecting adjacent rooms
Bathroom rough-in with new copper supply lines
New copper mainline connections and PRV installed at exterior foundation
Under-sink cabinet open showing new supply line connections after repipe
Hallway protected with plastic sheeting — ladder and skylight visible during repipe
Exterior stucco wall with multiple access holes and new pipe lines visible, electrical panel above
Staircase covered with plastic sheeting during whole-home repipe
Staircase and entryway sealed with plastic barriers during repipe work
Bedroom carpet and furniture fully protected with drop cloths during repipe
Staircase opening with new pipe routing and protection during repipe
Living room fully protected with plastic sheeting during whole-home repipe
Hallway fully sealed with hanging plastic barriers to protect flooring and walls
Full entryway and stairway protection during repipe
New copper mainline connections and shutoff valve installed at exterior meter
Laundry room with wall opening for new supply line installation
Upstairs hallway with PEX coil and tools staged for repipe installation
Living room and staircase fully covered with drop cloths during whole-home repipe
Staircase fully protected with drop cloths and wall access holes visible
Mainline trench along foundation showing new blue PEX line with ball valve
Home interior fully protected with plastic sheeting during whole-home repipe
Exterior tankless water heater with new copper connections installed
Hallway doorways sealed with plastic sheeting barriers to contain dust
Wall access openings in hallway with trim and masking tape — staircase area
Ceiling access holes cut for pipe routing — smoke detector visible
Two-story home protected throughout repipe process
Bathroom baseboard access cut for new toilet supply line installation
Hallway with ceiling access hole and drop cloths on floor during repipe
Open wall access showing new copper toilet supply connections to toilet tank
Bathroom rough-in showing new water heater connections and ceiling access
Bedroom and hallway protected with plastic sheeting during repipe
Large wall opening showing pipe replacement in dining room
Front yard mainline trench — new blue PEX water line running toward house
Bathroom wall access holes above towel bar for supply line replacement
Staircase protected with plastic sheeting during repipe work
Hallway and rooms sealed with plastic barriers during repipe work
New PEX lines with copper stub-outs installed inside open wall cavity
Living room kitchen area protected with plastic barriers during repipe
Multiple rectangular wall access holes cut in hallway for pipe routing
Multiple wall access holes with drywall patches ready for texture and paint
Bright living room fully protected with drop cloths and plastic during repipe
Hallway protected during repipe — bathroom visible
Access hole at toilet base showing new supply line stub-out installation
Bedroom wall and ceiling access holes cut for pipe routing during repipe
Two-story home interior protected — crew working on upper floor repipe
Staircase protected with plastic sheeting during repipe
New washer box and copper supply lines installed in wall cavity
Open wall cavity showing two new copper supply lines running through studs
Mainline trench through front yard — new blue PEX water line laid in with caution tape
Living room ceiling access holes with crown molding — drop cloths in place
Exterior stucco patched and retextured after repipe access holes
Living room furniture wrapped in plastic sheeting during repipe
Excavated mainline area — new copper shutoff valve and fittings at meter box
Inside wall cavity — new PEX connection installed
Utility hallway with ceiling access and floor protection during repipe
Refrigerator and white kitchen cabinets wrapped in plastic during repipe
Staircase covered during repipe work
New ABS sewer line laid in trench — mainline replacement in progress
Entryway ceiling access holes for pipe routing during whole-home repipe
New PRV and hose bib installed at exterior
Bathroom sink wall opened showing new copper supply line stub-outs
Kitchen cabinets and ceiling access opening with protection in place
PEX-to-copper transition manifold block in open wall — new supply rough-in complete
Copper repipe — Type L supply lines
Wall cavity opened showing new copper pipes and old galvanized line
Home protection setup with plastic covering during whole-home repipe
Interior wall opened showing old drain and new supply
Bedroom ceiling access holes with furniture and walls fully protected
Attic access and ceiling opening showing new copper pipe routing
Wall openings exposing old copper and new PEX runs
Wall texture repair in progress after repipe patching completed
Exterior copper repipe — stucco opened and patched
Kitchen fully wrapped in plastic — tile floors covered with drop cloths
Copper pipes laid out before installation
Hallway ceiling opened with multiple access holes for overhead pipe routing
Bathroom vanity, mirror, and fixtures wrapped in plastic for protection
Exterior mainline trench with new blue PEX water line and copper connections
Living room fully protected — crew working overhead
Mainline excavation showing new PRV, ball valve, and copper connections at meter
New copper pipe and ABS materials staged and ready for installation
Bathroom wall with two neatly cut access holes above towel bar for supply lines
Exterior stucco patched after repipe access openings were completed
Kitchen fully sealed with drop cloths and protective plastic sheeting
Copper shower valve and supply line rough-in
Ceiling with multiple square access holes cut for overhead pipe replacement
Deep mainline trench alongside home — new blue PEX replacement line laid in
PEX-A supply line installation
Kitchen with drop cloths on tile floor and city permit posted on refrigerator
Excavated exterior — new copper hose bib and shutoff valve installed at foundation
Popcorn ceiling with access holes cut for new PEX pipe installation
Small wall opening for toilet supply line replacement
Project site with NextLevel Repipe service van and home exterior
Bathtub wall opened showing new copper shower valve and tub spout stub-outs
Shower valve access hole with new copper supply connections
Home protection setup — hallway covered before repipe
Exterior stucco openings for outside pipe replacement
New PEX supply lines running vertically through open wall stud cavity
Severely corroded galvanized pipe showing heavy rust buildup inside
Completed copper repipe with clean soldering

Ready for Your Repipe?

Get a free in-home estimate — we'll walk through your home and give you an exact price on the spot.