Repipe Process

Repiping During a Remodel: Get the Order Right

A remodel is the best possible time to repipe, because the walls are already open and nobody has to apologize for them. It is also the easiest time to get the order wrong and pay twice.

The Right Sequence

  1. Design and permit
  2. Demo and open walls
  3. Repipe and drain work
  4. Inspection and pressure test
  5. Insulation and drywall
  6. Tile, cabinets, fixtures, paint

If plumbing happens after tile, you have invented a very expensive way to buy tile twice.

Remodel-Only Repipes vs Whole House

Some homeowners repipe just the remodeled area. That is reasonable when the rest of the system is healthy, and a bad idea when the rest of the system is original galvanized. Ask the honest question: is this remodel exposing the only problem, or the first one?

Where Coordination Breaks Down

  • Tile set before plumbing inspection
  • New cabinets installed before stub-outs are finalized
  • Two contractors each assuming the other pulled the permit
  • Finish materials ordered with no lead time for plumbing corrections

Value You Can Bank

Opening walls for a remodel costs money. Opening the same walls again next year costs the same money plus patching, texture, and paint. Doing both at once is the closest thing to a discount in this industry.

Frequently Asked Questions

Does a repipe need to happen before drywall?

Yes, always. Inspection comes before the wall closes.

Can a repipe be done in phases with a remodel?

Yes, but plan the phases so walls are not reopened.

Will it delay my remodel?

A couple of days, typically, and it is worth it.